NHAI MLFF Toll System Architecture diagram and RFID overhead antenna gantry deployment Vol. 2026 • Issue 17
10.5281/rfidsoftwares.2026.018 12 min read

India Opens First MLFF Tolling System on NH-48: National Expressway Architecture & High-Speed Freight Logistics

Engineering deep dive into the 8-lane Western Freight Corridor tolling overhaul: multi-gantry distance-based rating, heavy vehicle trailer occlusion mitigation, and high-throughput NPCI NETC 2.0 middleware.

Expressway Corridor NH-48 Corridor
Lane Configuration 6 to 8 Lanes
Akash Arora Read Paper
NHAI barrier-free Multi-Lane Free Flow toll gantry at Paranur Plaza GST Road Vol. 2026 • Issue 16
10.5281/rfidsoftwares.2026.017 11 min read

NHAI Launches India’s First Barrier-Free Multi-Lane Free Flow (MLFF) Toll at Paranur: The RFID, ANPR & Sensor-Fusion Architecture

Inside the engineering teardown of Tamil Nadu's GST Road barrierless toll corridor: sub-45ms edge arbitration, 120 km/h FASTag read windows, and 3D LiDAR volumetric classification.

Cruising Speed 120 km/h
Edge Sensor Arbitration < 45 ms
Akash Arora Read Paper
Hi, Can I Help ? 💬
AI